Tesla Gigafactory Texas 3 May 2021 Cyber Truck & Model Y Factory Construction Update (08:00AM)

169 Aufrufe
Published
Gigafactory Texas on 3 May 2021! This is where the Cyber Truck and Model Y will be built!
Another great day to fly at Giga Texas! Activity all over the place and I talked with two Tesla employees out doing videography work inside the plant and flying some drones for aerial shots as well! They were interested in some of my work and images, so who knows if some of these might be used by Tesla. We shall see.
In this video, we discuss the installation and function of a RETOX (Regenerative Thermal Oxidizer) or also known as RTO system meant to purify and clear the air of Volatile Organic Compounds (VOC’s) emitted during the paint process. We go into some depth to discuss the operation and functions of this system and as a bonus, we see them installing the major components this morning!

Timestamps:
RETOX system discussion and illustrations: 0:28 to 5:26
Drone flight footage & infographics: 5:32 to 28:20

Here are the highlights from today's video:
- We see some interesting developments on the far west site (across the highway) today, including the final outline of the foundation they are constructing (it is north-to-south oriented and of diamond shape) … it looks like a smaller version of the existing factory!
- We also see continued work to install water pipes off to the west in order to eventually connect the factory to the City of Austin water system.
- On the south side, we see more land clearing and filling up of the last-remaining pond, and some filling of the east side of the large water detention pond. Does this indicate some major design changes?
- Work in the SW footing field is resuming following all the rain today, along with more steel parts and other materials deliveries.
- The east structure continues to get more metal wall studs installed on the west wall, more concrete external walls on the east side and more roofing materials arranged and being installed.
- The big excavation pit south of the paint shop is still filled with some water and a lot of mud, but we also see GeoPier work a bit farther south on the west side near where the plumbing trenches have been excavated.
- The west structure continues to grow to the south, and it is getting more external concrete wall panels on the west side. More materials and equipment are being moved into the ground and second floors, as well as some more internal walls being erected. Masonry work around stairs and elevator shafts continues as well. Finally, the sample window display area looks to have some work resuming on it today.
- The Battery Cell area steel structure is again growing to the north, with all 4 cranes actively working this morning. They are pouring another concrete floor on the 3rd level as well as accepting more steel materials being delivered by trucks.
- The casting machine area footing field looks to be drier than yesterday and prepared for some construction to begin this week if all goes well. The temporary LNG tanks have yet to be moved, however.
- Work on the east side battery cathode plant area has slowed a bit due to heavy rains, so not much going on there this morning other than trying to dry out the soil and drain away the ponded rainwater areas.
- More deliveries of EVAPCO cooling tower parts were taking place at the old plant building this morning as well.

Thank you for watching and I hope this has been informative, educational and entertaining for you. If you would like, please consider supporting me via Patreon (link is in the description of this video and in the video itself) so I can continue to make and share these incredible videos.

Sources used in this video:
Randy @TerafactoryTexas
https://www.cecoenviro.com/retox-regenerative-thermal-oxidizer-rto-system-tower-type-adwest
http://www.gcesystems.com/thermal-oxidizers.html?gclid=Cj0KCQjw1a6EBhC0ARIsAOiTkrGpS_s3jaWgOpjPLBYqCGNt9eZPMFPhW3ZcA5J9MaUJ5tiVrGmy99caAoAuEALw_wcB
http://www.gcesystems.com/wp-content/uploads/2018/11/2-can-RTO-diagram.jpg
The Wolfpack Berlin: https://www.youtube.com/channel/UCvRenk988PP650XdsKHC1ig

Follow me on
Patreon https://www.patreon.com/joeslastchancegarage
Twitter @JoeTegtmeyer
Instagram (Joe’s Last Chance Garage) for the latest updates: #joeslastchancegarage
Facebook Joe Tegtmeyer and Joe’s Last Chance Garage

Use my Tesla Referral code https://www.tesla.com/referral/joe66892

Be sure to check out additional Texas Gigafactory footage on these channels:
@Jeff Roberts
@Terafactory Texas
@Texas Terafactory

Video, photos, illustrations and commentary on this video is by me, Joe Tegtmeyer unless otherwise annotated.

Music in this video is obtained from the YouTube free and unrestricted and royalty-free use library. Ending song is Mr. Sunny Face - Wayne Jones

Drones used are DJI Mavic Mini and Mavic Air 2.

Drone flight over Giga Texas is with permission of Tesla and CEO Elon Musk
Kategorien
Autos
Kommentare deaktiviert.